321-799-3460

Risk to Crew Health Due to Electrical Shock (Electrical Shock Risk)

Southern Delaware Wine, Food and Music Festival in Lewes

1 min read

Preparations for Next Moonwalk Simulations Underway (and Underwater)

The space shuttle Endeavour is seen on launch pad 39 with lightning in the background
The space shuttle Endeavour is seen on launch pad 39a as a storm passes by prior to the rollback of the Rotating Service Structure (RSS), Thursday, April 28, 2011, at Kennedy Space Center in Cape Canaveral, Fla. During the 14-day mission, Endeavour and the STS-134 crew will deliver the Alpha Magnetic Spectrometer (AMS) and spare parts including two S-band communications antennas, a high-pressure gas tank and additional spare parts for Dextre. Launch is targeted for Friday, April 29 at 3:47 p.m. EDT.
NASA

It is important to protect humans from unintended electrical current flow during spaceflight. The thresholds for contact electrical shock are well established, and standards and requirements exist that minimize the probability of contact electrical shock. Current thresholds were chosen (vs. voltage thresholds) because body impedance varies depending on conditions such as wet/dry, AC/DC, voltage level, large/small contact area, but current thresholds and physiological effects do not change. By addressing electrical thresholds, engineering teams are able to provide the appropriate hazard controls, usually through additional isolation (beyond the body’s impedance), current limiters, and/or modifying the voltage levels. Risk assessment determined that the probability of an event was extremely low, and the most serious consequence is expected to be involuntary muscle contraction.

Lightning strikes the Launch Pad 39B protection system
Lightning strikes the Launch Pad 39B protection system as preparations for launch of NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard continue, Saturday, Aug. 27, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29 at 8:33 a.m. ET. Photo Credit: (NASA/Bill Ingalls)

Directed Acyclic Graph Files

+ DAG File Information (HSRB Home Page)

+ Electrical Shock Risk DAG and Narrative (PDF)

+ Electrical Shock Risk DAG Code (TXT)

Share

Details

Last Updated
Mar 11, 2025
Editor
Robert E. Lewis

Share This Post

tango on perch

The Inn at Cocoa Beach
4300 Ocean Beach Blvd.
Cocoa Beach, FL 32931-3552
321 730 3110
reservations@theinnatcocoabeach.com

There is nothing to show here!
Slider with alias megamenu not found.

This website uses cookies to ensure you get the best experience on our website. Review our Privacy Policy to learn more or opt out.

Skip to content